Tangiwai

Tangiwai
  Copy


More Options: Make a Folding Card




Storyboard Description

This storyboard does not have a description.

Storyboard Text

  •  At 3pm on the 24th of December, the train left Wellington for Auckland.
  • Wellington - Auckland
  • At 8.02 rim of Ruapehu crater lake gives way, releasing the lahar.
  • 10.10pm Lahar reaches bridge and washes away pier four.
  • Cost money to fix the bridge, replace the train and expenses.
  • Some people got benefits from this like the people that had to fix the bridge.
  • At 10.21pm train crosses bridge which collapes.
  • At 10.30pm car Z falls into river and are swept down stream.
  • People were traumatised for ages some people even for the rest of their life.
  • During the whole disaster 151 people lost their lives.
  • At 4am bodies stared arriving at the hospital.
  • Many people died.
More Storyboards By gemmacharlize
Explore Our Articles and Examples

Try Our Other Websites!

Photos for Class   •   Quick Rubric   •   abcBABYart   •   Storyboard That's TPT Store