SOW pt 2

Ustvarite Snemalno Knjigo
Kopirajte to snemalno knjigo
SOW pt 2
Storyboard That

Ustvarite svojo snemalno knjigo

Preizkusite brezplačno!

Ustvarite svojo snemalno knjigo

Preizkusite brezplačno!

Snemalna Knjiga Besedilo

  • What if I don't know the answer?
  • It's ok if even after all your diligent research you do not know the answer to every question. If a question comes up that you don't have the answer to you can:1. Contact the AHJ if the SOW is during their business hours.2. Let your FR know that you have documented the question, and will follow up as soon as possible.
  • I have an email from the AHJ documenting that we do not need any landscaping permits for tree removal. I'm unsure about the monument sign. I'll just make a quick call to Jerry with the Highway Department. If I cant reach him, I will follow up Monday.
  • Communicate with your FR before the meeting.Remember to read the SOW invite e-mail from your FR carefully. This e-mail will often include elements of interest, what to bring, and documents to review. If you still have questions, reach out!
  • SOW Meeting: Accepted
  • Hint: We show love and a spirit of cooperation when we respond to communication from our FR as soon as possible.
  • Brother Smith has Accepted
  • Review "Regulatory" tab in the SOW Template, and compile information. You have prayerfully reviewed your worksheets and done any additional research. Now, you can break down the regulatory needs for the elements of interest and add them to the "Regulatory" Tab in the SOW template.
  • Riley County Ordinance 32.B Impervious Surfaces1.0 Must be no more than 40%of lot size1.1 Must Submit Silt and Sediment Control Plan before work.
  • The SOW template is an excel document. You can reference the March 2022 monthly meeting for more information on it.
  • Plumbing
  • Roof
  • SOW- Regulatory
  • Driveway
  • TIP: Try to document regulatory requirements clearly and concisely instead of using links to AHJ websites:
  • Brother James, Here is the information I compiled for the SOW TemplateDriveway: https://rileyco/ordinance.43.212.view.comDriveway:Silt and sediment control plan must be submitted to County for permit. Approval time is 1 week. Cost is based Impervious surface must not Exceed 40% of lot are
  • What should I bring?
  • Notes
  • Completed Worksheets- BRP, Preparation, Submittal
  • PPE
  • Notepad or electronic means to document questions or areas to research.
  • Blank permit Applications
Ustvarjenih več kot 30 milijonov snemalnih knjig